Login| Sign Up| Help| Contact|

Patent Searching and Data


Title:
車上システムおよび地上システム
Document Type and Number:
Japanese Patent JP6552891
Kind Code:
B2
Abstract:
PROBLEM TO BE SOLVED: To further suppress an increase of energy consumption at a time of recovery from delay.SOLUTION: An on-board system 100 comprises a delay time calculation unit 1, and a travel time adjustment unit 2. The delay time calculation unit 1 is configured to calculate delay time of a train T on the basis of schedule information 4 on the train T and present time. The travel time adjustment unit 2 is configured to allocate recovery time for recovering the train T from delay to a plurality of station-to-station sections and to adjust travel time in each of the plurality of station-to-station sections on the basis of at least either an allowance of each of the plurality of station-to-station sections or energy properties and of the delay time.SELECTED DRAWING: Figure 1

Inventors:
Hideaki Yuki
Yuji Kamo
Application Number:
JP2015131775A
Publication Date:
July 31, 2019
Filing Date:
June 30, 2015
Export Citation:
Click for automatic bibliography generation   Help
Assignee:
Toshiba Corporation
Toshiba Infrastructure Systems & Solutions Corporation
International Classes:
B60L15/40; B61L27/00
Domestic Patent References:
JP62131867A
JP60092955A
JP2015116895A
JP4079705A
Attorney, Agent or Firm:
Sakai International Patent Office