To provide a method constructing a large scaled high-rise tower of an RC construction or an SRC construction by a movable form method or a built-up form method without using a large-sized crane as much as possible.
A movable form 1 is assembled and is installed on the ground of a construction position of the large-scaled high tower structure, at the same time, a plurality of struts 2 are planted at the circumference section of the movable form 1, a climbing stage 3 supported by the struts 1 is constructed, a heavy equipment or the like necessary for constructing the large-scaled high tower structure is mounted on the climbing stage 3, and the movable form 1 is suspended from the climbing stage 3. The struts 2 are additionally planted to make the climbing stage 3 lift by itself and, at the same time, the construction of the large scaled high-rise tower 10 of a steel framed and reinforced concrete construction is progressed by making use of the movable form 1 lifted by being suspended from the climbing stage 3. The construction of the large scaled high-rise tower 10 is completed, and after the concrete has obtained its required strength, the heavy equipment or the like is put down to install it in the large scaled high-rise tower 10, and the assembly of the large scaled high-rise tower structure is completed.
SUGATA MASAHIRO
HABASAKI ATSUSHI
HOSHINO HARUO