To provide a management chart capable of enabling not only a worker but also a manager and the other persons in charge to confirm a progress status of every work process and a progress status of a plurality of work items.
This management table is provided with a plurality of work process parts 31 on which the names of the work process are described on a part or the whole of a number of areas obtained by dividing a strip circular space surrounded by at least two oval circular lines of different sizes, along the circular line, and detachable piece members f used attached to the ongoing work process part 31 to discriminate the work process, and the work process part 31 is configurated by a different display part to grasp the progress status of the work in each work process part 31.