To provide a method for charging a raw material for blast furnace, which can charge a raw material for blast furnace at an uniformed distribution into a bell-less blast furnace having a plurality of furnace top bunkers, and to provide a facility for charging a raw material for blast furnace.
In the facility for charging a raw material for blast furnace, the raw material for blast furnace is conveyed to a furnace top of the bell-less blast furnace 1 by a furnace top conveyor 3 and fed into the furnace top bunkers 21-23 from a furnace top hopper 4; the fed raw material for blast furnace is discharged into a receiver 10 from raw material discharging valves 91-93; and the discharged raw material for blast furnace is charged inside the furnace top of the bell-less blast furnace from a rotating chute 11. The facility for charging a raw material for blast furnace includes: a calculation device 14 for calculating a weight of the raw material for blast furnace inside the bunker by correcting bunker weight measurement values measured by load cells 121-123 with a preset correction coefficient; and a control device 15 for controlling the raw material discharging valves to be opened or closed based on the calculation result outputted by the calculation device 14.
JP2002038208A | 2002-02-06 | |||
JPH0428806A | 1992-01-31 | |||
JP2002302707A | 2002-10-18 | |||
JPS62156527A | 1987-07-11 | |||
JPS62151722A | 1987-07-06 | |||
JP2002038208A | 2002-02-06 | |||
JPH0428806A | 1992-01-31 | |||
JP2002302707A | 2002-10-18 | |||
JPS62156527A | 1987-07-11 | |||
JPS62151722A | 1987-07-06 |
US0009004A | 1852-06-08 | |||
US0009004A | 1852-06-08 |
Megumi Konishi
Hide Tanaka Tetsu
Ichi Hirose
Toru Miyasaka